Projects

Kookaburra Viaduct

Kookaburra Viaduct

Our first project in Papua New Guinea involved the construction of a 19 span viaduct connecting the Jacksons International Airport to the Waigani Government Cenre and the Parliament House.

Read more

Tropical Reef Shipyard Upgrade

Tropical Reef Shipyard Upgrade

This project involved the upgrade of the existing facilities at the Tropical Reef Shipyard in Cairns.

Read more

Gore Bay MR Fender Fabrication & Installation

Gore Bay MR Fender Fabrication & Installation

Smithbridge was engaged by Shell to fabricate and install a 26t steel truss between two concrete dolphins to provide an additional fender for the berthing of ships at their Gore Bay facility.

Read more

Temporary Dredge Mooring Facility - New Parallel Runway Project

Temporary Dredge Mooring Facility - New Parallel Runway Project

The Temporary Dredge Mooring Facility for the New Parallel Runway Project involved the design and construction of four dolphins to provide a temporary mooring for Jan De Nul's 54,100 DWT dredging vessel, the Charles Darwin.

Read more

Riverwalk Acceleration

Riverwalk Acceleration

Smithbridge was engaged to accelerate the piling on the latest Riverwalk project for John Holland.

Read more

Limmen River Bridge and Bing Bong Loadout Facility Works

Limmen River Bridge and Bing Bong Loadout Facility Works

Smithbridge was engaged to construction an 11 span bridge over the Limmen River and construction of a loadout facility as part of the Roper Bar Iron Ore Project.

Read more

Gladstone Precinct Boardwalk - Piling and Precast Placement

Gladstone Precinct Boardwalk - Piling and Precast Placement

Smithbridge was subcontracted to undertake piling and precast placement for the Gladstone Precinct Boardwalk.

Read more

Bell Bay Tank Relocation

Bell Bay Tank Relocation

Smithbridge Group was the principle contractor tasked with the relocation of three fuel storage tanks from the former Hydro Tasmania Bell Bay Power Station, to the proposed Mayfield Terminal in Newcastle, NSW for Stolthaven Australia Pty Ltd.

Read more

Cabbage Tree Creek Bridge - Demolition, Piling and Girder Installation

Cabbage Tree Creek Bridge - Demolition, Piling and Girder Installation

This project involved the demolition, piling and girder erection for the Cabbage Tree Creek Bridge upgrade as part of the Gateway Motorway (North) Additional Lane Project.

Read more

Daly River Bridge

Daly River Bridge

This project involved the construction of a 190m long x 12m wide eight span high level bridge over Daly River in the Northern Territory some 200km south of Darwin.

Read more

APLNG Onshore/Offshore Infrastructure Logistics (LOR)

APLNG Onshore/Offshore Infrastructure Logistics (LOR)

This project involved the installation of fender piles and heavy lifts for the aggregate hopper and conveyors for the Aggregate Load-Out Facility at the APLNG Project on Curtis Island.

Read more

Townsville Port Inner Habour Expansion (TPIX)

Townsville Port Inner Habour Expansion (TPIX)

In response to the anticipated growth of the Townsville region, the Port of Townsville Limited (POTL) developed the Townsville Port Inner Harbour Expansion Protect (TPIX). TPIX comprises numerous subprojects with the objective to increase the operational and import/export capacity of the Port. This project comprised two subprojects of the greater TPIX project: the redevelopment of Berth 10 incorporating a new wharf, passenger terminal and reconfiguration of roads and trunk services and the structural upgrade and expansion of the existing Berth 8. To deliver this work for POTL, the Seymour Whyte Smithbridge Joint Venture was formed and successfully delivered this project two months ahead of schedule. 

Read more

Bulk Liquids Berth 2

Bulk Liquids Berth 2

This project involved a variety of marine construction and heavy lift activities. Approximately 134 piles were installed and 245 precast elements were erected for John Holland. 

 

Read more

Bulahdelah Temporary Bridge Hire

Bulahdelah Temporary Bridge Hire

Smithbridge was engaged to provide temporary bridge design, certification, delivery, installation, regular inspection and removal of the temporary bridge at project completion.

Read more

Port of Brisbane Berth 11 & 12

Port of Brisbane Berth 11 & 12

This contract was won in a competitive public tender process in a field of 16 tenderers at a combined value of approximately A$54 million. The contract was a conventional construct only and involved the construction of Berth 11 and 12; an extension of existing port infrastructure at the Port of Brisbane.

Read more